SK Hynix Preparing NAND With ‘400-Layers’ Through Hybrid Bonding, 321-Layer NAND Shipping In 1H 2024

SK Hynix aims for mass production to start its 400-layer NAND at the end of 2025 while 321-layer NAND hits production in 1H 2025. Higher-storage capacity via 400-layer NAND is SK Hynix’s new target, hitting production in late 2025 after 321-layer NAND in 1H 2025 The need for higher storage capacity is never ending and looks like SK Hynix is aiming at breaking its records with its new plan to prepare a 400-layer NAND for the future storage drives. Etnews reports that the company wants to start the mass production of this 400-layer NAND by the end of 2025 and […]

Read full article at https://wccftech.com/sk-hynix-400-layer-nand-late-2025-321-layer-nand-1h-2025/